Full-Automatic Waste Tyre Recycling Line to Rubber Powder
hydraulic program comma easy operation and safe period of time
Mechanical description colon the tires more than 800 require to lower comma and minimize into four pieces in EPT periodthe size of piece is 200-500mm interval
Notes for making use of tire cutter colon
a period Inspect the knives often comma if look apparent blunt comma it ought to be sustain well timed comma and the support is 2-3 several years time period
b period the oil in hydraulic station need to be filtered and transformed often period EPTly filter when every a single and fifty percent yr interval
c period of time Wearing components colon rubber seals comma sent with an additional set when ship the EPT to the buyer period
three amp4 period EPT tire shredEPTZPS-900
Use colon
This EPT can immediately crush tires smaller sized than 800mm tires period of time At the EPT temperature comma can be put directly crushed into fifty ast 50 mm block comma so the subsequent rotating can grind into ten-30 meshes or wire and fiber separation gear period of time
Function colon
This EPT is a compact composition comma superior technologies comma minimal strength intake comma large effectiveness comma smashing off the check space for the composition comma upkeep is particularly convenient semi equipment with carbide surfacing technology comma substantial hardness comma high wear resistance comma and repeated repair using comma so has a EPTer provider lifestyle semi rotary monitor for the lattice structure of steel mesh comma blanking big location comma enabling the screening of certified rubber period Soon after the partition of huge tires can accomplish the influence of the exact same excl
Mechanical description colon the tires of 800mm diameter and rubber ring can right be broken into 50 ast50 mm of rubber block time period
Notes for employing EPT tire shredder colon
a period Inject gear oil into EPT oil lparhypoid gear oil rpar comma main bearings use calcium-based grease lubrication comma a few months right after the procedure of the EPT comma the oil ought to be changed and clear the fuel tank time period Given that then modify the oil after time each 12 months time period
b Right after deal with three comma000 tons of waste rubber lparin typical situations rpar commathe purchaser must grind the blade chopping edge after time period The blades is the dress in components comma the EPT provider daily life is 5-six many years comma when providing the EPT to the purchaser comma the shredEPTwill be geared up with edge hardness layer patching substance lparelectrodes rpar period of time
5 time period Double Rolls Rubber Crusher XKP-560
Use colon
Primarily employed for crack large rubber blocks into 40-50mm tiny rubber blocks period
Specialized parameters colon
Structure colon The rollers undertake alloy chilly tough forged irons with dress in-resisting comma sturdy characters period of time The mill flour is with teeth comma large groove time period
In orEPTto extend the services life of the cracker comma we recommend develop foundations for rubber cracker time period
The configurations of our XKP-560 rubber cracker are nylon bush grease lubrication and hard equipment floor EPT with reduce sounds and EPTer provider daily life interval
5Our crackers are created XiHu (West Lake) Dis.Hu (West Lake) Dis.nized with wonderful running platforms comma all the wires will be linked well from controlling program to motor period of time When using the EPT comma the consumers just need to have to join straight to the EPT interval
Entire-Automatic Waste Tyre Recycling Line to Rubber Powder
No interval | Title | Product | Qty period lparQty rpar |
Motor EPT lparKW rpar | ||
1 | One hook debeader | LSJ-1200 | one | 11 | ||
two | EPT tyre cutter | QDJ-1200 | one | five period5 | ||
three amp4 | EPT tyre shredder lparwith conveyor rpar |
ZPS-900 | 1 | 61 period5 | ||
five | Double Rolls Rubber Crusher | XKP560 | 1 | ninety | ||
six | Huge conveyor gear | BCL-eight | 1 | two | ||
7 | Modest conveyor equipment | BCL-three | one | 1 period1 | ||
eight | Big Magnet separator | BMS22 | 1 | two period2 | ||
9 | Little Magnet separator | SMS-1 | one | 1 period1 | ||
ten | Massive Shaking screen | BSS-8 | 1 | seven period5 | ||
eleven | Tiny Shaking display screen | SSS-three | 1 | 3 | ||
12 | Fiber separator | FS110 | one | 5 period5 | ||
13 | Fantastic Rubber Powder Pulverizing EPT | XJFS-420 | 4 | 123 | ||
Square vibrating sieve | 600 | one | ||||
Rubber powder collector | JFS500 | one | 7 period5 plus0 period75 equals8 period25 | |||
Screw conveyer | Phi200mm | 1 | period75 | |||
Screw conveyer | Phi132mm | 1 | period75 | |||
Storage pin | 1 period5cbm | one | ||||
Hopper | 1 | |||||
Belt conveyer | 1 | period75 | ||||
14 | Metal Baller EPT | 30T | one | seven period5 | ||
fifteen | Rubber powder EPT EPT | 1 | three | |||
24 | 334 period4KW |
No | Name | product | amount | EPT | ||
EPT tire pre-processing comma you will get lt 50 ast50MM rubber crumb | ||||||
one | Ring cutter | QQJ-1200 | 1 | 5 period5KW | ||
2 | Loop EPT | YQJ-295 | one | 15KW | ||
three | Strip cutter | QTJ-370 | 1 | 5 period5 KW | ||
four | Block cutter | QKJ-200 | 1 | 11 KW | ||
Rubber powder processing colon you will get twenty-30 mesh rubber powder commaat the exact same time comma individual the fiber and metal wire | ||||||
five | Tyre crusher | XKP400 | 1 | forty five KW | ||
XKP450 | 55 KW | |||||
XKP560 | seventy five KW | |||||
6 | Massive conveyor tools | BCL-8 | one | two KW | period of time | |
7 | Modest conveyor products | BCL-three | 1 | 1 period1 KW | ||
8 | Massive Magnet separator | BMS22 | 1 | two period2 KW | ||
nine | Small Magnet separator | SMS-one | one | one period1 KW | ||
10 | Large Shaking screen | BSS-8 | one | 7 period5 KW | ||
eleven | Tiny Shaking monitor | SSS-three | period | 1 | 3 KW | |
twelve | Fiber Separator | FS110 | one | eleven KW |